Location: Pernik Date: 2022
Elements manufactured for the project:
- Rectangular columns – H=716 cm
- T secondary beams L= 2118 cm
- Precast foundations - 130/130/110 cm
- Main 2TT beams with concrete upgrade L=1875 cm
- Total cubage of concrete: V= 2080 cubic metres